Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | Melton |
Model Number : | ZS,Customized |
Certification : | ISO/CE/GMP |
Price : | US $2,600-7,900 / Set |
Payment Terms : | L/C, T/T |
Supply Ability : | 10 Set/Sets per Month |
Delivery Time : | 5-8 work days |
Multi-Layer Square Vibrating Screen Pharmaceutical Professional Linear Vibrating Screen
1. Working Principle:
ZS sieving machine utilizes double vibrating motors as driving
source, when two motors synchronous reversely rotate. Eccentric
block generates are undone in parallel with the direction of motor
axis and united as one across the motor axis direction, so its
motion track is linear.
There is an angle of inclination two motors axis relative to screen
deck. Under the influence of resultant force of exciter force and
material self weight, material are throwed up to make saltatory and
linear motion forward.
2. Applications
It is widely used in chemical industry, grain and food industry.
Specially used for fine/powder or small granular material to
classify different levels of materials. It can be also applied in
flowing line to achieve automatic operation.
3.Features
High utilization rate of seive, large unite area, not easy to
block, but could replace the seive easily. Small volume, light
weight, easy construction and repairment, convenient installation
High efficiency and low cost.
High screen precision, good for circumstance protection.
Many kinds of screen meshes can be changed and long sevice life.
4. Partial Technical Parameter of Sieve Machine
Model | Dimension of deck (W× L)(mm) | Lay NO. | Power (Kw) | Frequency (r/min) | Amplitude (mm) |
ZS-520 | 500× 2000 | 1-3 4-6 | 2× 0.37 2× 0.55 | 960 | 3~4.5 |
ZS-525 | 500× 2500 | 1-3 4-6 | 2× 0.73 2× 0.75 | 960 | 3~4.5 |
ZS-1020 | 500× 2000 | 1-3 4-6 | 2× 0.75 2× 1.1 | 960 | 3~4.5 |
ZS-1025 | 500× 2500 | 1-3 4-6 | 2× 0.75 2× 1.5 | 960 | 3~4.5 |
Product Parts
Our Show
Payment & Delivery
FAQ
Q:What is the real delivery time of your factory?
A:10 to 15 days for general series products,meanwhile,customized
products would need 20 days to 40 days based on different
situations.
![]() |